UDDEVALLA SWEDEN, WASTE-TO-ENERGY PLANT

CHP PRODUCING WASTE TO ENERGY PLANT

Uddevalla Energi is building a new CHP producing waste to energy platn with an annual capacity for the thermal treatment of upto 100,000 tons of waste.

 

Fiberdur® received the order for the delivery and installation of approx. 2,500 m GRP pipes and more than 2,300 fittings for:

 

• Process water

• SO2-Stage

• Condensing-Stage

• NaOH-Stage

• WWTP-Stage

Scope of supply:

• Pipe and fittings

• Spool fabrication on site

• On site installation of piping systems

   including valves and steel supports

 

High product quality in combination with fast delivery time and flexibility were key factors for Fiberdur® to secure this turnkey order.

 

 

Customer:         

Fisia Babcock Environment GmbH   

Operator:

Uddevalla Energi

Diameter:

DN 25 - DN 400

System:

CSVE Vinylester pipe system

for 10 bar service pressure

Joints:

adhesive bonded

Constructed:

1008-2009


For further information please contact:

Wolfgang Keser

phone: 0049 2464 972 149

Opens window for sending emailwolfgang.keser@fiberdur.com