GHANNOUCH - TUNESIA 400 MW COMBINED CYCLE POWER PLANT

The Ghannouch Power Plant is located in South Tunisia, approx. 10 km in the North of Gabes. It is the second KA26 combined-cycle power plant in North Africa after "Terga" in Algeria.

 

The new plant will be erected in the area of the old power plant of Ghannouch thus allowing the use of existing commodities such as sea water intake and the discharge of waste water.

 

Fiberdur® received the order for the delivery of more than 1300 GRP pipes and 820 fittings DN 25 - DN 400.

 

 

Scope of supply:

Delivery of pipe systems

DN 25 to DN 400

Documentation

 

The quality of our products, production time efficiency as well as our expert engineering support were the key factors for Fiberdur® to receive this job.

 

 

Customer:                   

ALSTOM Power Systems

Operator:

Société Tunisienne de l'Electricité

et du Gaz (STEG)

Service:

Cooling water lines

System:

Vinylester PN 16/PN 10

Joints:

Adhesive bonding

Constructed:

2010 - 2011


For more information please contact:

Stephan Wipperfürth

phone: 0049 2464 972 148

Opens window for sending emailstephan.wipperfuerth@fiberdur.com