Lamination
1. Day
- Kick-off, introduction
- Transport and storage of Fiberdur-products
- Technology of laminating (butt-and-wrap lamination, T-mitre lamination, Stub-end lamination)
- Preparation of the pipes for butt and wrap and stub-end lamination
2. Day
- Preparation of the material for butt and wrap lamination DN 200
- Lamination spool DN 200 by client
- Preparation of the material for stub-end lamination DN 80/200
3. Day
- Visual control and discussion of results
- Practical execution of a stub-end lamination DN 80/200
- Discussion and settling of technical questions
- Visual control and discussion of results
- Turn over procedures and certificates
If you are interested to attend this seminar, please complete the registration form.



