GRP PIPES FOR THE WESTFALEN POWERPLANT

 

New Construction Block D + E

 

The Westfalen Power Station is a 800 MW coal-fired large-scale power plant located in the urban district of Hamm-Uentrop, North Rhine-Westphalia. The owners are RWE Power AG.

 

Since middle of the year 2008 the works for both new blocks D + E have been under construction.

 

Fiberdur® received the order for the complete project including the responsibilities: engineering, production, delivery and installation of the main and secondary cooling systems.

 

 

 

Engineering:

• Detail engineering (PDMS)

• Isometric drawings

• Spool drawings

• Support design

• Stress analysis

• Quality assurance

• Documentation

Production:

• Pipes and fittings

Installation:

• Prefabrication of pipe systems

• Final installation and pressure test

• Initial operation and testing


Supply and delivery of about 1500 m GRP pipes, 400 flanges and 850 elbows DN 25 - DN 3000

Customer:

   RWE Power AG

Operator:

   RWE Power AG

Material:

   CSVE Piping systems up to DN 3000

Application:

   Main- and secondary cooling systems

Joints:

   Adhesive bonded and laminated

Installation:

   2009-2012