GRP PIPES DN 2400 FOR THE EMSLAND POWER STATION
Installation of a Cooling Water Line DN 2400
Alstom Power Systems is constructing a gas- and steam power plant for RWE AG in Lingen/Germany. Capacity: 876 MW.
TPR Fiberdur® GmbH & Co. KG was commissioned to install a cooling water line DN 2400 with sand-reinforced GRP-Pipes.
Scope of Delivery: | |
|---|---|
• Installation | |
• Prefabrication at site | |
• Installation of piping systems including laminate connections | |
| |
| |
Customer: | Alstom Power Systems |
Operator: | RWE AG, Lingen, Germany |
Service: | Underground Cooling Water Line, 5 bar operating pressure |
System: | GRP sand-filled Pipe DN 2400 |
Joints: | Lamination at site |
Constructed: | 2007 - 2008 |